DocumentCode :
3649111
Title :
Some new concepts of setup costs in multimode resource-constrained project scheduling problem
Author :
Marek Mika;Rafaì Różycki;Grzegorz Waligóra
Author_Institution :
Institute of Computing Science, Poznań
fYear :
2012
Firstpage :
470
Lastpage :
474
Abstract :
The multimode resource-constrained project scheduling problem is considered. In some practical situations resources used to perform an activity have to be set up before the execution of this activity. Setup operations are characterized by two parameters setup time and setup cost. The latter is considered if the financial aspects of the schedule are taken into account. In this paper we present an adaptation of the classical models of setups, which are known from the machine scheduling theory, to the multimode project scheduling problem. Several new concepts are proposed as well.
Keywords :
"Scheduling","Adaptation models","Europe","Availability","Buildings","Planning","Fixtures"
Publisher :
ieee
Conference_Titel :
Methods and Models in Automation and Robotics (MMAR), 2012 17th International Conference on
Print_ISBN :
978-1-4673-2121-1
Type :
conf
DOI :
10.1109/MMAR.2012.6347841
Filename :
6347841
Link To Document :
بازگشت