DocumentCode
3649129
Title
A flowshop scheduling problem with machine deterioration and maintenance activities
Author
Agnieszka Rudek;Radosław Rudek
Author_Institution
Department of Systems and Computer Networ Wrocł
fYear
2012
Firstpage
40
Lastpage
45
Abstract
In this paper, we analyse the makespan minimization flowshop scheduling problem, where the processing times of jobs depend on the number of performed jobs and maintenance activities. Since the considered problem with two machines seems to be NP-hard, thus, we propose a branch and bound method and some heuristic and metaheuristic algorithms to solve it.
Keywords
"Maintenance engineering","Heuristic algorithms","Schedules","Aging","Job shop scheduling","Algorithm design and analysis","Biological system modeling"
Publisher
ieee
Conference_Titel
Methods and Models in Automation and Robotics (MMAR), 2012 17th International Conference on
Print_ISBN
978-1-4673-2121-1
Type
conf
DOI
10.1109/MMAR.2012.6347915
Filename
6347915
Link To Document