    Simulation of mobile falsework utilization methods in bridge construction

  • Author

    He-Xu Liu;Ming-Fung Francis Siu;Ronald Ekyalimpa;Ming Lu;Simaan AbouRizk;Sebastian Hollermann;Hans-Joachim Bargstädt

  • Author_Institution
    University of Alberta, Construction Engineering and Management, Edmonton, Alberta, Canada
  • fYear
    2012
  • Firstpage
    1
  • Lastpage
    13
  • Abstract
    Scaffolds and shoring systems are generally referred to as the falsework in bridge construction, serving as temporary structures to support bridge span construction. The falsework cost usually accounts for 50-70% of the total project concrete budget. Falsework installation and advancing methods can greatly impact the completion time and actual cost. Thus, simulation can be instrumental in planning bridge construction operations and analyzing various options by evaluating postulated “what-if” scenarios. This study uses a previously constructed bridge in Sweden as a case study to test three feasible construction sequence alternatives. One of these alternatives was implemented on the actual construction of this bridge. Modeling was performed in Simphony, which captures the unique construction sequence requirements and constraints, resulting in project durations for each alternative. Results from simulation experiments were corroborated by the construction engineer who had worked on the bridge project in terms of the advantages that each alternative method possesses.
  • Keywords
    "Concrete","Bridges","Mobile communication","Structural beams","Shafts","Tendons","Strips"
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference (WSC), Proceedings of the 2012 Winter
  • ISSN
    0891-7736
  • Print_ISBN
    978-1-4673-4779-2
  • Type

    conf

  • DOI
    10.1109/WSC.2012.6465325
  • Filename
    6465325