    Blackout — Key aspects for grid restoration

  • Author

    Robert Schmaranz;Josef Polster;Stephan Brandl;Herwig Renner;Michael Weixelbraun;Klaus Köck;Michael Marketz

  • Author_Institution
    KELAG Netz GmbH, Klagenfurt, Austria
  • fYear
    2013
  • fDate
    6/1/2013 12:00:00 AM
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Recently occurred critical system states have triggered a broad discussion between Distribution System Operators (DSO) and Transmission System Operators (TSO) about the actuality and validity of grid restoration plans all across ENTSO-E. Generally being in the responsibility of the TSOs, the role of DSOs in the restoration concept in case of islanded grid restoration is not yet clearly defined and has been a topic in many discussions. Beside the organizational aspects regarding grid restoration, various technical requirements have to be considered. This paper highlights the key aspects of well-known as well as newly arisen topics. Furthermore, to guarantee a successful grid restoration, a 3-step approach is introduced. It contains islanded grid operation tests, the development of an accurate and reliable simulation model and the simulator-based training of the operators.
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution (CIRED 2013), 22nd International Conference and Exhibition on
  • Type

    conf

  • DOI
    10.1049/cp.2013.0530
  • Filename
    6683133