DocumentCode
3660412
Title
Recurrent neural network for solving the short-term hydrothermal scheduling problem
Author
Lei Bao;Yanjun Shen;Peng Miao;Wenwu Li
Author_Institution
College of Electrical Engineering and New Energy, China Three Gorges University, Yichang, Hubei, 443002, China
fYear
2015
Firstpage
2388
Lastpage
2393
Abstract
The short-term hydrothermal generation scheduling problem is aimed to minimize the total thermal plant cost while satisfying diverse hydraulic, thermal and load balance constraints. Firstly, a multi-reservoir cascaded hydro power system is set up. The power system consists of several cascaded hydro plants and several thermal plants. The power generation function is the function of water discharge rate and storage volume. Then, a recurrent neural network is proposed to optimize the power generation function. Simulation results show the validity of the proposed method.
Keywords
"Reservoirs","Power generation","Neural networks","Scheduling","Thermal loading","Mathematical model"
Publisher
ieee
Conference_Titel
Information and Automation, 2015 IEEE International Conference on
Type
conf
DOI
10.1109/ICInfA.2015.7279686
Filename
7279686
Link To Document