• DocumentCode
    3660939
  • Title

    A performance-centred maintenance strategy for industrial DSM projects

  • Author

    HJ Groenewald;M Kleingeld;JC Vosloo

  • Author_Institution
    CRCED-Pretoria, North-West University, South Africa
  • fYear
    2015
  • Firstpage
    50
  • Lastpage
    53
  • Abstract
    Underperformance of industrial DSM projects is often caused by a lack of proper maintenance practices. This results in wasted electricity cost-savings opportunities and an increased demand for electricity on the national grid. A solution to the problem of underperforming industrial DSM projects is to apply a performance-centered maintenance (PCM) strategy. The various aspects of the PCM strategy are presented in this paper. It is based on the plan-do-check-act (PDCA) cycle for continuous improvement, which also forms part of the ISO 50001 energy management standard. Results show that the application of the PCM strategy could result in a performance increase of up to 70% when applied to underperforming industrial DSM projects. This proves the value of the PCM strategy to maximise and sustain the performance of industrial DSM projects.
  • Keywords
    "Phase change materials","Reliability","Planning","Training","Condition monitoring"
  • Publisher
    ieee
  • Conference_Titel
    Industrial and Commercial Use of Energy (ICUE), 2015 International Conference on the
  • Electronic_ISBN
    2166-059X
  • Type

    conf

  • DOI
    10.1109/ICUE.2015.7280246
  • Filename
    7280246