DocumentCode :
3660939
Title :
A performance-centred maintenance strategy for industrial DSM projects
Author :
HJ Groenewald;M Kleingeld;JC Vosloo
Author_Institution :
CRCED-Pretoria, North-West University, South Africa
fYear :
2015
Firstpage :
50
Lastpage :
53
Abstract :
Underperformance of industrial DSM projects is often caused by a lack of proper maintenance practices. This results in wasted electricity cost-savings opportunities and an increased demand for electricity on the national grid. A solution to the problem of underperforming industrial DSM projects is to apply a performance-centered maintenance (PCM) strategy. The various aspects of the PCM strategy are presented in this paper. It is based on the plan-do-check-act (PDCA) cycle for continuous improvement, which also forms part of the ISO 50001 energy management standard. Results show that the application of the PCM strategy could result in a performance increase of up to 70% when applied to underperforming industrial DSM projects. This proves the value of the PCM strategy to maximise and sustain the performance of industrial DSM projects.
Keywords :
"Phase change materials","Reliability","Planning","Training","Condition monitoring"
Publisher :
ieee
Conference_Titel :
Industrial and Commercial Use of Energy (ICUE), 2015 International Conference on the
Electronic_ISBN :
2166-059X
Type :
conf
DOI :
10.1109/ICUE.2015.7280246
Filename :
7280246
Link To Document :
بازگشت