DocumentCode :
3665248
Title :
Enhanced NERC TPL-003 steady state compliance studies at American Transmission Company
Author :
Chengyue Guo;Charles Lawrence;Mark Povolotskiy;Marianna Vaiman
Author_Institution :
ATC, Waukesha, WI 53188, USA
fYear :
2015
fDate :
7/1/2015 12:00:00 AM
Firstpage :
1
Lastpage :
5
Abstract :
This paper describes enhancements to ATC´s cascading study criteria and the implementation of a fast automated process using POM/OPM software for conducting comprehensive steady state multiple element contingency screening and cascading analysis, finding mitigations to restore the system to be within emergency and/or normal performance limits, and automatically tabulating significant results and summaries in spreadsheets. The new process provides a better definition of the total load at risk. It is utilized as a part of ATC´s NERC TPL-003 compliance studies starting from 2013.
Keywords :
"Steady-state","Conductors","Planning","Generators","Load modeling","Reliability","Standards"
Publisher :
ieee
Conference_Titel :
Power & Energy Society General Meeting, 2015 IEEE
ISSN :
1932-5517
Type :
conf
DOI :
10.1109/PESGM.2015.7285690
Filename :
7285690
Link To Document :
بازگشت