Abstract
Frequency Containment reserves (FCR), previously called primary reserves, are an important feature insuring safe and reliable operations of the Continental Europe grid. Due to their strong technical requirements, gas and hydro power plants are the almost exclusive provider of FCR. Since gas power plants are becoming less profitable in Europe, a lot of efforts are deployed into FCR diversification. This paper assesses the potential for battery energy storage systems (BESS) to deliver FCR combined with a slow-moving thermal power plant and other emergency solutions such as load shedding and dissipating resistances. A proportional-integral energy management control loop is used whose parameters are tuned by an economic evaluation. We show that economic opportunity already exists today. Some limitations are discussed due to simplifying assumptions. The best solution consists of a 1MW/1.4MWh battery and a 0.09MW power plant per MW of provided FCR reducing by 90% the reservation on power plants.
Keywords
"Power generation","Batteries","Economics","Europe","Energy management","Maintenance engineering"
Publisher
ieee
Conference_Titel
Power & Energy Society General Meeting, 2015 IEEE
ISSN
1932-5517
Type
conf
DOI
10.1109/PESGM.2015.7285849
Filename
7285849
Link To Document