• DocumentCode
    3695566
  • Title

    Research on collaborative supply chain scheduling based on manufacturing cluster

  • Author

    Zhang Qinghua;Fu Tong;Wang Yi;Guo Qingyang

  • Author_Institution
    University of Science and Technology Beijing, China
  • fYear
    2015
  • fDate
    6/1/2015 12:00:00 AM
  • Firstpage
    908
  • Lastpage
    913
  • Abstract
    For the collaborative manufacturing problem after the customer order decoupling point in mass customization, a mathematical model of collaborative manufacturing and distribution of components scheduling is proposed. As the model is NP hard problem, a heuristic algorithm which combined GA and PSO algorithm was designed and the compound algorithm was proved effective. A two-phase algorithm of GA and PSO is designed for making comparison with the compound algorithm, and the comparison result shows the compound algorithm has the better optimization effect.
  • Keywords
    "Collaboration","Job shop scheduling","Algorithm design and analysis","Mathematical model","Arrays"
  • Publisher
    ieee
  • Conference_Titel
    Industrial Electronics and Applications (ICIEA), 2015 IEEE 10th Conference on
  • Type

    conf

  • DOI
    10.1109/ICIEA.2015.7334239
  • Filename
    7334239