• DocumentCode
    3717036
  • Title

    Reconfiguration-Aware Task Graph Scheduling

  • Author

    Hessam Kooti;Eli Bozorgzadeh

  • Author_Institution
    Google Inc., Mountain View, CA, USA
  • fYear
    2015
  • Firstpage
    163
  • Lastpage
    167
  • Abstract
    Due to increasing demand for reconfigurability in embedded systems, real-time task scheduling is challenged by non-negligible reconfiguration overheads. We introduce the problem of real-time task scheduling under reconfiguration overhead on heterogeneous reconfigurable systems while considering the data dependencies and data communication overhead. We introduce a novel graph representation which captures the delay overhead due to data dependencies and reconfiguration. We formulate the problem as a network flow problem and provide a mixed integer linear programming solution to minimize the completion time so called makespan. Results show that our proposed scheduling improves the makespan by 24.20% (on average) in comparison with maximum-transition-overhead scheduling.
  • Keywords
    "Processor scheduling","Real-time systems","Program processors","Bandwidth","Hardware","Mixed integer linear programming","Embedded systems"
  • Publisher
    ieee
  • Conference_Titel
    Embedded and Ubiquitous Computing (EUC), 2015 IEEE 13th International Conference on
  • Type

    conf

  • DOI
    10.1109/EUC.2015.33
  • Filename
    7363632