• DocumentCode
    3721034
  • Title

    A hybrid heuristic algorithm for the no-wait flowshop scheduling problem

  • Author

    Vahid Riahi;Morteza Kazemi

  • Author_Institution
    Industrial Engineering Department, Shiraz University of Technology, Iran
  • fYear
    2015
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    The no-wait flowshop scheduling problem (NWFSP) that needs jobs to be processed without interruption between consecutive machines is a NP-hard combinatorial optimization problem, and embodies a significant area in production scheduling. The objective is set to find the scheduling which minimizes the makespan. In this paper, a new hybrid ant colony optimization (ACO) and Simulated Annealing (SA) algorithm is presented to solve NWFSP. The computational results on 29 benchmark instances provided by Carlier and Reeves and comparison with other reported results in the literature approves the efficiency of the proposed algorithm.
  • Keywords
    "Job shop scheduling","Heuristic algorithms","Processor scheduling","Simulated annealing","Algorithm design and analysis"
  • Publisher
    ieee
  • Conference_Titel
    Computer Science and Software Engineering (CSSE), 2015 International Symposium on
  • Type

    conf

  • DOI
    10.1109/CSICSSE.2015.7369247
  • Filename
    7369247