Study on duration calculate model of railway construction based on LSM
Author
Liqiang Liu; Yisheng Liu; Yuanjie Tang
Author_Institution
Beijing Jiaotong University, Beijing, china
fYear
2015
fDate
7/1/2015 12:00:00 AM
Firstpage
1
Lastpage
5
Abstract
Reasonable duration is very important in terms of construction. This study presents a new model for calculate the railway construction project duration by means of linear Scheduling method. It gives two kinds of activity combination, the two respectively the calculation method of combination of the construction duration. And the duration of the validity of the proposed method are determined verified by an actual railway project instance.
Keywords
"Rail transportation","Schedules","Time factors","Strips","Railway engineering","Information rates"
Publisher
ieee
Conference_Titel
Logistics, Informatics and Service Sciences (LISS), 2015 International Conference on
Type
conf
DOI
10.1109/LISS.2015.7369805
Filename
7369805
Link To Document