DocumentCode
3727235
Title
Business process optimization from single timestamp event log
Author
Riyanarto Sarno;Fitrianing Haryadita; Kartini; Sarwosri;Adhatus Solichah A
Author_Institution
Informatics Department, Faculty of Information Technology, Institut Teknologi Sepuluh Nopember, Indonesia
fYear
2015
Firstpage
50
Lastpage
55
Abstract
Time-cost optimization (TCO) may be defined as a process to identify suitable construction activities to get the minimum duration of process and minimum additional cost which is needed. CPM crashing project is one of method to sole the time-cost optimization. But CPM crashing project need some data to speeding up the process business whereas in reality there are a lot of data which is represent using single timestamp event log which does not provide. There for this paper represents a method to get data which is use to crashing project. The data is got from averaging time execution of each activity in case in event log. Then to crashing the project this paper use linear programming to get minimum duration and minimum additional cost.
Keywords
"Computer crashes","Business","Mathematical model","Optimization","Unified modeling language","Linear programming","Production"
Publisher
ieee
Conference_Titel
Computer, Control, Informatics and its Applications (IC3INA), 2015 International Conference on
Type
conf
DOI
10.1109/IC3INA.2015.7377745
Filename
7377745
Link To Document