DocumentCode :
3728858
Title :
Rescheduling flowshops under simultaneous disruptions
Author :
Ketrina Katragjini;Eva Vallada;Rub?n Ruiz
Author_Institution :
Sistemas de Optimizaci?n Aplicada, Universitat Polit?cnica de Val?ncia, Cno. de Vera s/n, Spain
fYear :
2015
Firstpage :
84
Lastpage :
91
Abstract :
Production planning and scheduling systems are pervasive in manufacturing systems to increase productivity, variety and customization without incurring in high costs. A large number of impromptu disruptions frequently affect the scheduled operations and invalidate the original schedules. Rescheduling actions have to be triggered in order to reduce the impact on the performance of the system. A large body of research covering miscellaneous problem characteristics can be found in the scheduling literature. Even so, the application of scheduling techniques is still infrequent in real-life scheduling problems. In this work we generate eight types of disruptions that affect the original schedules simultaneously. We apply three rescheduling methods and compare their results with simple rule based repair actions typically employed in production environments. Statistical analysis is used to demonstrate that the proposed methods outperform the rule based approaches by a significant margin, highlighting their effectiveness in real life manufacturing settings.
Keywords :
"Schedules","Job shop scheduling","Measurement","Manufacturing","Uncertainty","Linear programming","Upper bound"
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Systems Management (IESM), 2015 International Conference on
Type :
conf
DOI :
10.1109/IESM.2015.7380141
Filename :
7380141
Link To Document :
بازگشت