• DocumentCode
    3728871
  • Title

    Multi-objective optimization for periodic preventive maintenance

  • Author

    Amir Ebrahimi Zade;Sasan Barak;Hamidreza Maghsoudlou;Mehdi Toloo

  • Author_Institution
    Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran
  • fYear
    2015
  • Firstpage
    173
  • Lastpage
    182
  • Abstract
    This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, multi-objective particle swarm optimization (MOPSO) algorithm is implemented. Also, as well as MOPSO, two other optimization algorithms are used for comparing the results. Eventually, Taguchi method with metrics analysis is presented to tune the algorithms´ parameters and a multiple criterion decision making (MCDM) technique based on the technique for order of preference by similarity to ideal solution (TOPSIS) is applied to choose the best algorithm. Comparison results confirmed supremacy of MOPSO to the other algorithms.
  • Keywords
    "Single machine scheduling","Preventive maintenance","Optimization","Mathematical model","Algorithm design and analysis"
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Systems Management (IESM), 2015 International Conference on
  • Type

    conf

  • DOI
    10.1109/IESM.2015.7380154
  • Filename
    7380154