DocumentCode :
3728919
Title :
A two-machine flow-shop scheduling with a deteriorating maintenance activity on the second machine
Author :
Ahmed Gara-Ali;Marie-Laure Espinouse
Author_Institution :
G-SCOP, Univ. Grenoble Alpes, Grenoble, France
fYear :
2015
Firstpage :
481
Lastpage :
488
Abstract :
Simultaneously scheduling jobs and preventive maintenance is a topical subject in the scheduling literature. In this paper, we study a two-machine flow-shop makespan scheduling problem with a deteriorating maintenance period on the second machine, that is, delaying the maintenance increases the time required to perform it. We show that the studied problem is NP-hard and we establish some conditions of the optimal schedule. We also develop a branch and bound (B&B) algorithm to solve this problem. Numerical experiments show that the B&B method can solve large-size instances.
Keywords :
"Optimal scheduling","Schedules","Job shop scheduling","Upper bound","Preventive maintenance"
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Systems Management (IESM), 2015 International Conference on
Type :
conf
DOI :
10.1109/IESM.2015.7380202
Filename :
7380202
Link To Document :
بازگشت