Title : 
Description of the simulator developed for the new RAS to be installed in the power system of Uruguay
         
        
            Author : 
S. Beledo;N. Yedrzejewski
         
        
            Author_Institution : 
UTE Uruguay
         
        
        
        
        
            Abstract : 
In electric power systems there are contingencies that can cause overload of any equipment, angular and voltage stability problems and frequency stability issues due to imbalances between load and generation. Most of those contingencies require disconnecting load to ensure the stability of the system and the integrity of the equipment. In most cases disconnection should be performed so quickly that it is possible only automatically. Such solutions are commonly referred by the acronym RAS, which means “Remedial Action Scheme”. UTE is currently implementing a solution of RAS [1] type to protect the network against the most severe contingencies.
         
        
            Keywords : 
"Servers","Graphics","Limiting","Capacitors","Biographies"
         
        
        
            Conference_Titel : 
Innovative Smart Grid Technologies Latin America (ISGT LATAM), 2015 IEEE PES
         
        
        
            DOI : 
10.1109/ISGT-LA.2015.7381152