    Description of the simulator developed for the new RAS to be installed in the power system of Uruguay

  • Author

    S. Beledo;N. Yedrzejewski

  • Author_Institution
    UTE Uruguay
  • fYear
    2015
  • Firstpage
    194
  • Lastpage
    197
  • Abstract
    In electric power systems there are contingencies that can cause overload of any equipment, angular and voltage stability problems and frequency stability issues due to imbalances between load and generation. Most of those contingencies require disconnecting load to ensure the stability of the system and the integrity of the equipment. In most cases disconnection should be performed so quickly that it is possible only automatically. Such solutions are commonly referred by the acronym RAS, which means “Remedial Action Scheme”. UTE is currently implementing a solution of RAS [1] type to protect the network against the most severe contingencies.
  • Keywords
    "Servers","Graphics","Limiting","Capacitors","Biographies"
  • Publisher
    ieee
  • Conference_Titel
    Innovative Smart Grid Technologies Latin America (ISGT LATAM), 2015 IEEE PES
  • Type

    conf

  • DOI
    10.1109/ISGT-LA.2015.7381152
  • Filename
    7381152