    A new method of cost contingency management

  • Author

    Mohammed Wajdi Hammad;Alireza Abbasi;Michael J. Ryan

  • Author_Institution
    School of Engineering and Information Technology, University of New South Wales, Canberra, Australia
  • fYear
    2015
  • Firstpage
    38
  • Lastpage
    42
  • Abstract
    Controlling the progress and performance of a project is pivotal to achieve its planned goals. Schedule and cost are often used to make a baseline for managing projects´ progress, but there are always uncertainties in planning and estimating the schedule and cost of projects. Therefore, a contingency reserve is needed to manage uncertainties and risks. In this paper, we present a new cost contingency management method. To show the benefit of our new proposed method, it is applied to a real-life bridge maintenance project, and then it is compared with an existing cost contingency management method. The comparison shows that our new method can help the project manager obtain more detailed information about the financial status of the project.
  • Keywords
    "Contingency management","Bridges","Resource management","Estimation","Uncertainty","Maintenance engineering","Probability distribution"
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IEEM), 2015 IEEE International Conference on
  • Type

    conf

  • DOI
    10.1109/IEEM.2015.7385604
  • Filename
    7385604