A new method of cost contingency management
Author
Mohammed Wajdi Hammad;Alireza Abbasi;Michael J. Ryan
Author_Institution
School of Engineering and Information Technology, University of New South Wales, Canberra, Australia
fYear
2015
Firstpage
38
Lastpage
42
Abstract
Controlling the progress and performance of a project is pivotal to achieve its planned goals. Schedule and cost are often used to make a baseline for managing projects´ progress, but there are always uncertainties in planning and estimating the schedule and cost of projects. Therefore, a contingency reserve is needed to manage uncertainties and risks. In this paper, we present a new cost contingency management method. To show the benefit of our new proposed method, it is applied to a real-life bridge maintenance project, and then it is compared with an existing cost contingency management method. The comparison shows that our new method can help the project manager obtain more detailed information about the financial status of the project.
Keywords
"Contingency management","Bridges","Resource management","Estimation","Uncertainty","Maintenance engineering","Probability distribution"
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2015 IEEE International Conference on
Type
conf
DOI
10.1109/IEEM.2015.7385604
Filename
7385604
Link To Document