DocumentCode :
3732882
Title :
New benchmark results for the stochastic resource-constrained project scheduling problem
Author :
Roel Leus;Salim Rostami;Stefan Creemers
Author_Institution :
ORSTAT, Faculty of Economics and Business, KU Leuven, Belgium
fYear :
2015
Firstpage :
204
Lastpage :
208
Abstract :
In this article* we study the stochastic resource-constrained project scheduling problem or SRCPSP, where project activities have stochastic durations. A solution is a scheduling policy, and we propose a new class of policies that is a superset of most of the existing classes that are available in the literature. A policy in this new class makes a number of a-priori decisions in a pre-processing phase while the remaining scheduling decisions are made on-line. A two-phase local-search algorithm is proposed to find high-quality policies within the class. Our computational results indicate that the proposed procedure outperforms all existing algorithms for large instances.
Keywords :
"Schedules","Scheduling","Processor scheduling","Uncertainty","Project management","Economics"
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IEEM), 2015 IEEE International Conference on
Type :
conf
DOI :
10.1109/IEEM.2015.7385637
Filename :
7385637
Link To Document :
بازگشت