DocumentCode
3733044
Title
Integrated model of production plan and preventive maintenance based on a game-theoretic framework
Author
J. W. Hu;Z. H. Jiang
Author_Institution
School of Mechanical Engineering, Shanghai Jiao Tong University, China
fYear
2015
Firstpage
1007
Lastpage
1011
Abstract
A joint model for integrating preventive maintenance (PM) with the capacitated lot sizing problem (CLSP) based on a game-theoretic framework has been proposed. Assume the production rate varies from period to period according to total lot size of each production period (PP). An imperfect PM model is established for system running with dynamic production rate, which is performed at scheduled times, and minimal repair (MR) is adopted to restore the system to work without altering hazard rate when failure happens. Considering availability reduction caused by maintenance and effect of production rate on hazard rate function of system, a Stackelberg game theory model is adopted to handle the interactive effect between production plan and PM schedule. The optimal production rate of each PP and PM sequences are obtained simultaneously. An example is studied to validate the model, also the results are discussed.
Keywords
"Production","Maintenance engineering","Reliability","Hazards","Linear programming","Schedules"
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2015 IEEE International Conference on
Type
conf
DOI
10.1109/IEEM.2015.7385800
Filename
7385800
Link To Document