• DocumentCode
    3733044
  • Title

    Integrated model of production plan and preventive maintenance based on a game-theoretic framework

  • Author

    J. W. Hu;Z. H. Jiang

  • Author_Institution
    School of Mechanical Engineering, Shanghai Jiao Tong University, China
  • fYear
    2015
  • Firstpage
    1007
  • Lastpage
    1011
  • Abstract
    A joint model for integrating preventive maintenance (PM) with the capacitated lot sizing problem (CLSP) based on a game-theoretic framework has been proposed. Assume the production rate varies from period to period according to total lot size of each production period (PP). An imperfect PM model is established for system running with dynamic production rate, which is performed at scheduled times, and minimal repair (MR) is adopted to restore the system to work without altering hazard rate when failure happens. Considering availability reduction caused by maintenance and effect of production rate on hazard rate function of system, a Stackelberg game theory model is adopted to handle the interactive effect between production plan and PM schedule. The optimal production rate of each PP and PM sequences are obtained simultaneously. An example is studied to validate the model, also the results are discussed.
  • Keywords
    "Production","Maintenance engineering","Reliability","Hazards","Linear programming","Schedules"
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IEEM), 2015 IEEE International Conference on
  • Type

    conf

  • DOI
    10.1109/IEEM.2015.7385800
  • Filename
    7385800