• DocumentCode
    3733053
  • Title

    Optimal maintenance service contract involving discrete preventive maintenance using principal agent theory

  • Author

    Eka K.A. Pakpahan;B.P. Iskandar

  • Author_Institution
    Department of Industrial Engineering, Harapan Bangsa Institute of Technology, Indonesia
  • fYear
    2015
  • Firstpage
    1051
  • Lastpage
    1055
  • Abstract
    Maintenance subcontracting has been widely implemented. The owner of equipment hires an agent to perform maintenance actions with a predetermined availability target to be met. The traditional payment scheme such as a fixed price, a cost reimbursement is effective only to ensure the achievement of the availability target. However, there are circumstances where pushing the agent to exceed the target will be rewarding, especially in high operational revenue such as in mining industry. To get this reward, a new payment scheme is needed. This research aims to study maintenance contract payment schemes that would motivate an agent to achieve a higher performance which is beyond the target. A principal agent theory is used as it allows to model the owner´s and the agent´s decision making process simultaneously.
  • Keywords
    "Contracts","Preventive maintenance","Mining industry","Industrial engineering","Complexity theory","Numerical models"
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IEEM), 2015 IEEE International Conference on
  • Type

    conf

  • DOI
    10.1109/IEEM.2015.7385809
  • Filename
    7385809