• DocumentCode
    3743477
  • Title

    Optimal control of maintenance instants and intensities in building energy efficiency retrofitting project

  • Author

    Bo Wang;Zhou Wu;Bing Zhu;Xiaohua Xia

  • Author_Institution
    Department of Electrical, Electronics and Computer Engineering (EECE), University of Pretoria, 0028, South Africa
  • fYear
    2015
  • Firstpage
    2643
  • Lastpage
    2648
  • Abstract
    This paper incorporates the maintenance time schedule optimization into the maintenance planning problem for building energy efficiency retrofitting project. An impulsive switched system model is employed to describe the aggregate performance and population dynamics of the retrofitted items. The maintenances are considered as impulsive effects that switch the items to different working states. The control objective is to optimize the combination of maintenance instants and intensities to maximize the overall energy savings and financial payback of the retrofitting project against deteriorations. The feasibility and boundedness of the optimal control problem is discussed. A multi-scale Differential Evolution algorithm is proposed as a numerical solver, which optimizes the maintenance time schedule and intensities simultaneously. Simulation results illustrate the effectiveness of the proposed approach.
  • Keywords
    "Maintenance engineering","Buildings","Switches","Schedules","Optimization","Switched systems","Sociology"
  • Publisher
    ieee
  • Conference_Titel
    Decision and Control (CDC), 2015 IEEE 54th Annual Conference on
  • Type

    conf

  • DOI
    10.1109/CDC.2015.7402614
  • Filename
    7402614