• DocumentCode
    3746820
  • Title

    Lead time modeling in production planning

  • Author

    Erinc Albey;Reha Uzsoy

  • Author_Institution
    Edward P. Fitts Department of Industrial and Systems Engineering, College of Engineering, North Carolina State University, Raleigh, 27695-7906, USA
  • fYear
    2015
  • Firstpage
    1996
  • Lastpage
    2007
  • Abstract
    We use two mathematical models to represent the dependency between workload releases and lead times: a linear programming model with fractional lead times (FLT) and a clearing function (CF) based nonlinear model. In an attempt to obtain a reference solution, a gradient based simulation optimization procedure (SOP) is used to determine the lead times that, when used in the FLT model, yield the best performance. Results indicate that both FLT and CF models perform well, with CF approach performing slightly better at very high workload scenarios. The SOP is able to improve upon the performance of both models across all experimental conditions, suggesting that FLT and CF models are limited in representing the lead time dynamics. All three models yield quite different lead time patterns at critical machines, suggesting the need for further study of the behavior of these models.
  • Keywords
    "Lead","Computational modeling"
  • Publisher
    ieee
  • Conference_Titel
    Winter Simulation Conference (WSC), 2015
  • Electronic_ISBN
    1558-4305
  • Type

    conf

  • DOI
    10.1109/WSC.2015.7408315
  • Filename
    7408315