    Simulation based multi-objective cost-time trade-off for multi-family residential off-site construction

  • Author

    Samer Bu Hamdan;Aladdin Alwisy;Mohamed Al-Hussein;Simaan AbouRizk;Ziad Ajweh

  • Author_Institution
    Hole School of Construction Engineering, Department of Civil and Environmental Engineering, University of Alberta, 116 St & 85 Ave, Edmonton, T6G 2R3, CANADA
  • fYear
    2015
  • Firstpage
    3391
  • Lastpage
    3401
  • Abstract
    Off-site construction is a shift toward a more efficient building process in terms of minimizing cost and decreasing duration of projects. However, since off-site construction consists of two separate phases, a comprehensive cost-time trade-off is essential. It gives control for the overall process where the direct and indirect effect of work performed on an individual task can be measured and evaluated with respect to the final project performance factors. The research presented in this paper develops a simulation model to study the dynamic relationship between off-site manufacturing and cost-time trade-off. A multi-objective analysis for two main indirect costs and inventory cost of the manufactured building components are proposed in order to provide a decision support system tool to clarify any ambiguity in the dynamic relationship between the project´s two stages, and assist the manager to improve project planning and control.
  • Keywords
    "Resource management","Layout"
  • Publisher
    ieee
  • Conference_Titel
    Winter Simulation Conference (WSC), 2015
  • Electronic_ISBN
    1558-4305
  • Type

    conf

  • DOI
    10.1109/WSC.2015.7408500
  • Filename
    7408500