• DocumentCode
    375387
  • Title

    Scheduling of design projects using artificial intelligence

  • Author

    Yan, Ji-hong ; Wu, Cheng

  • Author_Institution
    Nat. CIMS Eng. Res. Center, Tsinghua Univ., Beijing, China
  • Volume
    1
  • fYear
    2001
  • fDate
    2001
  • Abstract
    Summary form only given. This paper studies the scheduling of design projects in a concurrent development process with uncertain number of feedback revisions. At first, definitions describing the concurrent activities are proposed for concurrent scheduling, they are the definitions of layer number of the activity, concurrent time and activity respectively. These definitions can describe the sequential relationships, resource constrained relationships between activities explicitly. Five rules for concurrent activity execution are given. On the basis of activity formulations, an optimization based methodology that combines heuristic algorithm, artificial intelligence (fuzzy, genetic algorithm) and scheduling theory is developed
  • Keywords
    artificial intelligence; design engineering; fuzzy set theory; genetic algorithms; project management; scheduling; artificial intelligence; concurrent activity execution rules; concurrent development process; concurrent scheduling; design projects scheduling; feedback revisions; fuzzy algorithm; genetic algorithm; heuristic algorithm; key factors; resource constrained relationships; scheduling theory; sequential relationships; Artificial intelligence; Computer integrated manufacturing; Design engineering; Feedback; Fuzzy logic; Genetic algorithms; Heuristic algorithms; Optimization methods; Scheduling algorithm; Time factors;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management of Engineering and Technology, 2001. PICMET '01. Portland International Conference on
  • Conference_Location
    Portland, OR
  • Print_ISBN
    1-890843-06-7
  • Type

    conf

  • DOI
    10.1109/PICMET.2001.952328
  • Filename
    952328