• DocumentCode
    3760386
  • Title

    An on-load test method for the Y/? converter transformer base on inrush current

  • Author

    Haosheng Huang;Yu Liu;Xiangping Kong;Peng Li;Yi Yang

  • Author_Institution
    Department of Power System Technology, Jiangsu Electric Power Company Research Institute, Nanjing 211103, China
  • fYear
    2015
  • Firstpage
    1653
  • Lastpage
    1656
  • Abstract
    For the Y/Δ converter transformer in the converter station, the transformer has only two windings, and the on load test cannot be implemented to test the polarities of current transformers´ (CTs´) secondary loops. In order to fill this gap, a novel polarity determination method for the CTs of the Y/Δ converter transformer is presented in this paper. Firstly, the configurations of CTs and relay protections for converter transformer are introduced. Besides, the characteristics of the inrush currents caused by charging the converter transformer is also analyzed. Based on that, a polarity determination method of CTs is proposed. The impact of harmonics on the on-load test data of the converter transformer can be effectively avoided with the proposed method. The proposed approach is validated with the on-load test data of the practical converter transformer.
  • Keywords
    "Current transformers","Surges","Surge protection","Power industry","Windings","Protective relaying","Harmonic analysis"
  • Publisher
    ieee
  • Conference_Titel
    Electric Utility Deregulation and Restructuring and Power Technologies (DRPT), 2015 5th International Conference on
  • Type

    conf

  • DOI
    10.1109/DRPT.2015.7432516
  • Filename
    7432516