DocumentCode :
3761466
Title :
Using three-winding transformers to save money and improve reliability and performance
Author :
Cory A. Helfrich;Ron W. Carlson
Author_Institution :
Saudi Aramco, P.O. Box 9252 Dhahran, 31311, Saudi Arabia
fYear :
2015
Firstpage :
1
Lastpage :
6
Abstract :
Many factors affect the cost, reliability, and performance of industrial power distribution systems. In fact, designing an industrial power system often presents tradeoffs between these three factors. This paper describes how using three-winding transformers can reduce the costs while improving the performance and reliability of industrial power systems.
Keywords :
"Circuit breakers","Oil insulation","Reliability engineering","Windings","Integrated circuit reliability","Power transformers"
Publisher :
ieee
Conference_Titel :
Petroleum and Chemical Industry Committee Conference (PCIC), 2015 IEEE
ISSN :
0090-3507
Print_ISBN :
978-1-4799-8501-2
Electronic_ISBN :
2161-8127
Type :
conf
DOI :
10.1109/PCICON.2015.7435101
Filename :
7435101
Link To Document :
بازگشت