• DocumentCode
    3761469
  • Title

    The deployment of an offshore EMCS system in Tabasco, Mexico — Preparing the grounds for a more technologically advanced and comprehensive automation solution

  • Author

    Alfredo Arriola;Julian Canseco;Isaac Gongora;Marco Antonio Alamilla

  • Author_Institution
    Schneider Electric USA, Electrical Engineer, Houston, TX
  • fYear
    2015
  • Firstpage
    1
  • Lastpage
    7
  • Abstract
    This paper discusses the design and deployment of an Energy Management and Control System (EMCS) for the monitoring and control of MV switchgear, motor control centers (MCCs), and low voltage (LV) loads on an exploration company´s offshore oil site. This paper also reviews constraints faced during EMCS design, which took place in conjunction with a local Engineering, Procurement, and Construction (EPC) company, and the exploration company, the project´s customer. Finally, we show how the EMCS design prepared the customer for the future deployment of a SCADA HMI, fast load shedding, load restoration, and load sharing operational across the site´s multiple production centers and platforms - the customer´s ultimate goal.
  • Keywords
    "Electromagnetic compatibility","Production facilities","Generators","Companies","Monitoring","Control systems"
  • Publisher
    ieee
  • Conference_Titel
    Petroleum and Chemical Industry Committee Conference (PCIC), 2015 IEEE
  • ISSN
    0090-3507
  • Print_ISBN
    978-1-4799-8501-2
  • Electronic_ISBN
    2161-8127
  • Type

    conf

  • DOI
    10.1109/PCICON.2015.7435104
  • Filename
    7435104