DocumentCode :
3762690
Title :
Interconnection of hydro power plant through 20 kV distributed line to improve electrical power supply in Dieng Central Java
Author :
Mochammad Facta; Hermawan
Author_Institution :
Electrical Engineering Dept., Universitas Diponegoro, Semarang - Indonesia
fYear :
2015
Firstpage :
363
Lastpage :
366
Abstract :
Hydro power plant is possible to be present and has interconnection to distribution line. The presence of such power plant is expected to supply additional power and overcome voltage drop at load side. In this paper, several experimental works based on simulation and primary data from field measurement are presented to show the performance of interconnection of hydro power plant through 20 kV distribution line to improve electrical power supply in Dieng - Central Java. Several requirements were observe and investigated by conducting simulation experiment. Several analyses such as Load flow, short circuit and stability were performed. As the results, the presence of hydro power plant has given positive impact to the profile of voltage in 20 kV distribution system. All power flows to the load properly and no reverse power back to the power plant or substation.
Keywords :
"Integrated circuit interconnections","Voltage measurement","Substations","Electric potential","Power measurement","TV","Relays"
Publisher :
ieee
Conference_Titel :
Information Technology, Computer, and Electrical Engineering (ICITACEE), 2015 2nd International Conference on
Print_ISBN :
978-1-4799-9861-6
Type :
conf
DOI :
10.1109/ICITACEE.2015.7437830
Filename :
7437830
Link To Document :