DocumentCode :
3770580
Title :
Automated testing of high voltage insulation using a micro-processor controlled tangent delta bridge and power supply
Author :
George A. Przybys
Author_Institution :
Tettex Instruments, Inc., 1055 West Germantown Pike, Fairview Village, Pennsylvania 19409, United States
fYear :
1985
Firstpage :
129
Lastpage :
133
Abstract :
Insulation measurements on high voltage equipment are usually performed using a bridge method, comparing the specimen against a known standard. The measuring process involves adjusting the high voltage level, reading a nullindicator, balancing the bridge, transcribing the readings and eventually analyzing the data. This process has been completely automated by means of a micro-processor and a measuring system suitable for high voltage laboratories or assembly line testing is described in this paper.
Keywords :
"Voltage measurement","Insulation","Bridge circuits","Dielectric measurement","Generators","Capacitance","Current measurement"
Publisher :
ieee
Conference_Titel :
Electrical/Electronics Insulation Conference, 1985 EIC 17th
Print_ISBN :
978-1-5090-3115-3
Type :
conf
DOI :
10.1109/EIC.1985.7458593
Filename :
7458593
Link To Document :
بازگشت