DocumentCode :
3771264
Title :
Development of a simulated service test for insulation systems used in turbine-generator rotors
Author :
Edward A. Boulter
Author_Institution :
Materials and Processes Laboratory, Medium Steam Turbine, Generator & Gear Department, General Electric Company, West Lynn, Massachusetts, USA
fYear :
1965
Firstpage :
209
Lastpage :
212
Abstract :
The Generator Rotor Simulated Service Test represents a new and useful method of comparing different slot armor insulation systems in a functional manner. The capability to combine mechanical, electrical and thermal stresses on Iow cost samples of new and aged slot armor constructions has speeded the development and application of new materials. A new type of molded fibrous glass and resin slot armor was shown to be superior and has been successfully adopted for product use. A continuing program of materials evaluation with this facility is underway and yielding valuable data.
Keywords :
"Insulation","Rotors","Stress","Aging","Heating","Copper","Generators"
Publisher :
ieee
Conference_Titel :
Electrical Insulation Conference, 1965 Sixth
Print_ISBN :
978-1-5090-3105-4
Type :
conf
DOI :
10.1109/EIC.1965.7461229
Filename :
7461229
Link To Document :
بازگشت