DocumentCode
377656
Title
Commissioning of the SLS digital BPM system
Author
Schlott, V. ; Dach, M. ; Dehler, M. ; Kramert, R. ; Pollet, P. ; Schilcher, T. ; Ferianis, M. ; DeMonte, R. ; Kosicek, A. ; Ursic, R.
Author_Institution
Paul Scherrer Inst., Villigen, Switzerland
Volume
3
fYear
2001
fDate
2001
Firstpage
2397
Abstract
During the commissioning of the Swiss Light Source (SLS) first operational experience has been gathered with the newly developed digital beam position monitor (DBPM) system. The DBPM performance could be characterized in all available operation modes, which are: single turn, turn-by-turn, closed orbit and tune. All modes can be selected independently for each sector of the booster and storage ring through the EPICS-based SLS control system by simple re-programming of the digital processing chain. Laboratory measurements as well as measurements on the SLS accelerators will be presented, offering insights in the operational experience and the performance of the DBPM system. In addition, a monitoring system (POMS) for the transverse mechanical positions of each BPM block in reference to the adjacent quadrupole magnets has been installed and commissioned. First results will be presented, showing a horizontal and vertical movement of the BPM blocks as a function of beam current (heat load on the vacuum chamber) in the SLS storage ring
Keywords
electron accelerators; particle beam diagnostics; storage rings; SLS; Swiss Light Source; closed orbit; commissioning; digital beam position monitor; position monitoring system; single turn; tune; turn-by-turn; Bandwidth; Control systems; Extraterrestrial measurements; Laboratories; Laser sintering; Light sources; Monitoring; Radio frequency; Signal resolution; Storage rings;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Conference_Location
Chicago, IL
Print_ISBN
0-7803-7191-7
Type
conf
DOI
10.1109/PAC.2001.987394
Filename
987394
Link To Document