DocumentCode
377718
Title
Superconducting final focusing system for KEKB
Author
Tsuchiya, K. ; Ohuchi, N. ; Ogitsu, T. ; Ozaki, T. ; Sugahara, R.
Author_Institution
KEK, Tsukuba, Japan
Volume
1
fYear
2001
fDate
2001
Firstpage
181
Abstract
A superconducting final focusing system for the KEKB B-Factory was constructed and has been operating since 1998. It consists of two solenoid field compensation magnets, two final focusing quadrupole magnets, and three kinds of correction coils (normal and skew dipoles, and skew quadrupole). The system has been operating without any serious problems and its total operating time has reached 17,000 hours. This paper describes the details of the system and operating experiences gathered during the long-term operation
Keywords
accelerator magnets; colliding beam accelerators; electron beam focusing; storage rings; superconducting magnets; KEKB; KEKB B-Factory; dipoles; skew dipole; skew quadrupole; solenoid field compensation magnets; superconducting final focusing system; Colliding beam devices; Conductors; Electron beams; Geometrical optics; Positrons; Quantum cascade lasers; Radiation detectors; Solenoids; Superconducting coils; Superconducting magnets;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Conference_Location
Chicago, IL
Print_ISBN
0-7803-7191-7
Type
conf
DOI
10.1109/PAC.2001.987464
Filename
987464
Link To Document