DocumentCode
377811
Title
Commissioning of the REX-ISOLDE linac
Author
Kester, O. ; Ames, E. ; Cederkäll, J. ; Forstner, O. ; Wenander, E. ; Nilsson, T. ; Äystö, J. ; Bongers, H. ; Emhofer, S. ; Habs, D. ; Rudolph, K. ; Sieber, T. ; von Hahn, R. ; van den Bergh, P.
Author_Institution
CERN, Geneva, Switzerland
Volume
1
fYear
2001
fDate
2001
Firstpage
566
Abstract
The radioactive beam experiment (REX-ISOLDE) is now in the commissioning phase. REX-ISOLDE is a pilot experiment for testing a new concept of post acceleration at ISOLDE/CERN. The concept of REX-ISOLDE using a Penning trap-EBIS combination as a charge breeder and a compact linac for post acceleration requires detailed tests of all components in order to get a high efficiency. First measurements with REXTRAP, the transfer beam line and the REXEBIS have been done as well as first acceleration of stable beams from the EBIS with use of REXRFQ
Keywords
accelerator RF systems; beam handling equipment; ion accelerators; ion sources; linear accelerators; particle traps; radioactive ion beams; Penning trap-EBIS combination; REX-ISOLDE linac commissioning; REXEBIS; REXRFQ; REXTRAP; charge breeder; compact linac; pilot experiment; post acceleration; radioactive beam experiment; transfer beam line; Acceleration; Cooling; Electron traps; Energy resolution; Ion sources; Life estimation; Linear particle accelerator; Particle beams; Testing; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Conference_Location
Chicago, IL
Print_ISBN
0-7803-7191-7
Type
conf
DOI
10.1109/PAC.2001.987570
Filename
987570
Link To Document