Commissioning of the Coupled Cyclotron Facility at NSCL
Author
Miller, P. ; Marti, F. ; Poe, D. ; Steiner, M. ; Stetson, J. ; Wu, X.Y.
Author_Institution
NSCL, East Lansing, MI, USA
Volume
4
fYear
2001
fDate
2001
Firstpage
2557
Abstract
The Coupled Cyclotron Facility at Michigan State University is being completed with the experimental program scheduled to start in July 2001. First beam through the paired cyclotrons was obtained on 10 October 2000
Keywords
cyclotrons; Coupled Cyclotron Facility commissioning; Michigan State University; NSCL; Cyclotrons; Electrostatics; Iron; Laboratories; Optical coupling; Particle beams; Probes; Production; Structural beams; Superconducting magnets;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Conference_Location
Chicago, IL
Print_ISBN
0-7803-7191-7
Type
conf
DOI
10.1109/PAC.2001.987829
Filename
987829
Link To Document