The Coupled Cyclotron Facility at Michigan State University is being completed with the experimental program scheduled to start in July 2001. First beam through the paired cyclotrons was obtained on 10 October 2000
Keywords :
cyclotrons; Coupled Cyclotron Facility commissioning; Michigan State University; NSCL; Cyclotrons; Electrostatics; Iron; Laboratories; Optical coupling; Particle beams; Probes; Production; Structural beams; Superconducting magnets;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Conference_Location :
Chicago, IL
Print_ISBN :
0-7803-7191-7
Type :
conf
DOI :
10.1109/PAC.2001.987829
Filename :
987829
Link To Document :
بازگشت