DocumentCode
377910
Title
Recent operational data on continuous top-up operation at the Advanced Photon Source
Author
Emery, L.
Author_Institution
Adv. Photon Source, Argonne Nat. Lab., IL, USA
Volume
4
fYear
2001
fDate
2001
Firstpage
2599
Abstract
Since June 2000, there have been three 6-day or 13-day periods of continuous top-up operations at the Advanced Photon Source, totaling four weeks. We report on injection and storage ring parameters and present a statistical analysis of x-ray beam stability
Keywords
electron accelerators; particle beam stability; storage rings; Advanced Photon Source; X-ray beam stability; continuous top-up operations; injection; storage ring parameters; Control systems; Feedback; Histograms; Laboratories; Process control; Pulse measurements; Stability analysis; Statistical analysis; Storage rings; Timing;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Conference_Location
Chicago, IL
Print_ISBN
0-7803-7191-7
Type
conf
DOI
10.1109/PAC.2001.987844
Filename
987844
Link To Document