• DocumentCode
    377992
  • Title

    Measurements of intra-beam scattering growth times with gold beam below transition in RHIC

  • Author

    Fischer, W. ; Bai, M. ; Blaskiewicz, M. ; Brennan, J.M. ; Cameron, P. ; Connolly, R. ; Lehrach, A. ; Parzen, G. ; Tepikian, S. ; Zeno, K. ; van Zeijts, J.

  • Author_Institution
    Brookhaven Nat. Lab., Upton, NY, USA
  • Volume
    4
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    2857
  • Abstract
    While RHIC is filled with beam, bunches are stored for up to several minutes at the injection energy before acceleration starts. In gold operation, the RHIC injection energy is below transition. A bunch length increase, and correspondingly an increase in the longitudinal emittance, can lead to particle loss during transition crossing and rebucketing into the storage buckets. The longitudinal growth of gold beams in RHIC at injection is dominated by intra-beam scattering. Measurements of longitudinal growth times are presented and compared with computations
  • Keywords
    colliding beam accelerators; ion accelerators; particle beam stability; storage rings; RHIC injection energy; bunches; gold operation; injection energy; intra-beam scattering; longitudinal growth times; particle loss; rebucketing; storage buckets; transition crossing; Gold; Ion beams; Length measurement; Light scattering; Monitoring; Particle beam injection; Particle scattering; Size measurement; Testing; Time measurement;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
  • Conference_Location
    Chicago, IL
  • Print_ISBN
    0-7803-7191-7
  • Type

    conf

  • DOI
    10.1109/PAC.2001.987934
  • Filename
    987934