DocumentCode :
378080
Title :
Commissioning of the Relativistic Heavy Ion Collider
Author :
Trbojevic, D. ; Ahrens, L. ; Blaskiewicz, M. ; Brennan, M. ; Bai, M. ; Cameron, P. ; Cardona, J. ; Connolly, R. ; de Long, J. ; Drees, A. ; Fliller, R.P. ; Fischer, W. ; Ganetis, G. ; Glenn, W. ; Hahn, H. ; Hayes, T. ; Lehrach, A. ; MacKay, W. ; Kewisch,
Author_Institution :
Brookhaven Nat. Lab., Upton, NY, USA
Volume :
4
fYear :
2001
fDate :
2001
Firstpage :
3138
Abstract :
This report describes in detail steps performed in bringing the Relativistic Heavy Ion Collider (RHIC) from the commissioning into the operational stage when collisions between 60 bunches of fully striped gold ions, were routinely provided. Corrections of the few power supply connections by beam measurements are described. Beam lifetime improvements at injection, along the acceleration are shown. The beam diagnostic results such as the Schottky detector, beam profile monitor, beam position monitors, the tune meter and others, are shown
Keywords :
colliding beam accelerators; commissioning; ion accelerators; particle beam diagnostics; particle beam injection; storage rings; RHIC; Relativistic Heavy Ion Collider; Schottky detector; beam diagnostics; beam lifetime; beam position monitor; beam profile monitor; commissioning; injection; power supplies; tune meter; Acceleration; Extraterrestrial measurements; Gold; Magnets; Monitoring; Orbits; Particle beams; Power measurement; Power supplies; Predictive models;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Conference_Location :
Chicago, IL
Print_ISBN :
0-7803-7191-7
Type :
conf
DOI :
10.1109/PAC.2001.988030
Filename :
988030
Link To Document :
بازگشت