• DocumentCode
    378137
  • Title

    B-Factory intermediate DC magnet power systems reliability modeling and results

  • Author

    Bellorno, P. ; Donaldson, A. ; Macnair, D.

  • Author_Institution
    SLAC Collaboration, Stanford Univ., CA, USA
  • Volume
    5
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    3684
  • Abstract
    The B-Factory is a high-energy physics facility for studying matter versus anti-matter asymmetry. It utilizes 200 Intermediate DC power systems, employing 2.5 to 17kW switchmode converters, to supply beam-shaping magnets with regulated current. Redundancy and modularity were considered to maximize reliability and minimize mean time to replace (MTTR), within technical limitations and cost constraints. Described are the configurations that were considered and reliability prediction models. The SLAC decision to employ a single converter was sound. However, 2 years of operation have confirmed that converter reliability must be improved
  • Keywords
    accelerator magnets; colliding beam accelerators; electron accelerators; power supplies to apparatus; power system reliability; storage rings; switched mode power supplies; 2.5 to 17 kW; B-Factory; SLAC; beam-shaping magnets; cost constraints; high-energy physics facility; intermediate DC power systems; matter versus anti-matter asymmetry; mean time to replace; reliability; reliability prediction models; switchmode converters; technical limitations; Availability; Costs; Magnetic switching; Power cables; Power system modeling; Power system reliability; Power systems; Production facilities; Redundancy; Switching converters;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
  • Conference_Location
    Chicago, IL
  • Print_ISBN
    0-7803-7191-7
  • Type

    conf

  • DOI
    10.1109/PAC.2001.988219
  • Filename
    988219