Title :
Fermilab Main Injector commissioning status
Author :
P.S. Martin;C.S. Mishra
Author_Institution :
Fermi Nat. Accel Lab., Batavia, IL, USA
Abstract :
The Fermilab Main Injector construction project is nearing completion. The commissioning of the Main Injector began in late 1998. The status of the beam studies and fulfilment of the project commissioning milestones is presented.
Keywords :
"Particle beams","Resonance","Particle beam injection","Acceleration","Structural beams","Proton accelerators","Production","Fabrication","Joining processes","Permanent magnets"
Conference_Titel :
Particle Accelerator Conference, 1999. Proceedings of the 1999
Print_ISBN :
0-7803-5573-3
DOI :
10.1109/PAC.1999.795616