• DocumentCode
    3786447
  • Title

    Installation and commissioning of the helium refrigeration system for the CMS magnet

  • Author

    G. Perinic;T. Dupont;D. Legrand;M. Pezzetti

  • Author_Institution
    Eur. Organ. for Nucl. Res., Geneva, Switzerland
  • Volume
    14
  • Issue
    2
  • fYear
    2004
  • Firstpage
    1708
  • Lastpage
    1710
  • Abstract
    A new helium refrigeration plant with a cooling capacity of 800 W at 4.45 K, 4500 W between 60 K and 80 K, and 4 g/s liquefaction simultaneously has been installed in its temporary position inside the Compact Muon Solenoid assembly hall at CERN. The commissioning of the compressor station has been achieved, the commissioning of the cold box and the cryostats is under way. First operation results are presented.
  • Keywords
    "Helium","Refrigeration","Collision mitigation","Solenoids","Cooling","Mesons","Petroleum","Testing","Assembly systems","Cryogenics"
  • Journal_Title
    IEEE Transactions on Applied Superconductivity
  • Publisher
    ieee
  • ISSN
    1051-8223
  • Type

    jour

  • DOI
    10.1109/TASC.2004.831048
  • Filename
    1325134