DocumentCode
382088
Title
Purchaser´s involvement in CBS design and implementation
Author
Lev, Leonid
Author_Institution
Israel Electr. Corp. Ltd., Haifa, Israel
Volume
1
fYear
2002
fDate
2002
Firstpage
378
Abstract
Surveys of various projects highlight that poor requirements and lack of user involvement are the most common causes of project failures. Purchasers are more involved in computer based systems (CBS) design and implementation. A problem that still requires additional investigations is how can the purchaser overcome misunderstandings with the contractor and what is his role in CBS design and implementation. Those and some other problems of purchaser´s involvement in the process of design and implementation of CBS are examined in this paper.
Keywords
computer purchase; project management; computer based systems design; computer based systems implementation; contractor; project failures; purchasers; Modems; Planing; Process design; Project management; Proposals; Risk management; Systems engineering and theory;
fLanguage
English
Publisher
ieee
Conference_Titel
Engineering Management Conference, 2002. IEMC '02. 2002 IEEE International
Print_ISBN
0-7803-7385-5
Type
conf
DOI
10.1109/IEMC.2002.1038461
Filename
1038461
Link To Document