Title :
Developing the International Space Station integrated verification measurement program
Author :
Haskins, Bill R.
Author_Institution :
Boeing Co., Houston, TX, USA
Abstract :
The International Space Station (ISS) Program Master Integration and Verification Plan (PMI&VP) requires that the systems engineering verification team establish and implement an integrated verification measurement program. This paper captures the knowledge and experience acquired through the International Space Station systems engineering efforts to develop, implement, and report a detailed set of integrated stage verification planning and closure metrics. The information and lessons learned, contained in this paper, may provide insight, direction, and a starting point for other large engineering organizations seeking to institute a measurement program.
Keywords :
aerospace testing; space vehicles; systems engineering; International Space Station; closure metric; integrated verification measurement program; planning metric; systems engineering; Control systems; Engineering management; Extraterrestrial measurements; International Space Station; Kelvin; Knowledge engineering; Personnel; Quality management; Space stations; Systems engineering and theory;
Conference_Titel :
Digital Avionics Systems Conference, 2002. Proceedings. The 21st
Print_ISBN :
0-7803-7367-7
DOI :
10.1109/DASC.2002.1052950