DocumentCode :
384757
Title :
Expected consequences of transition to market in Russian electric power industry
Author :
Belyaev, L.S. ; Marchenko, O.V. ; Podkovalnikov, S.V.
Author_Institution :
Energy Syst. Inst., Irkutsk, Russia
Volume :
1
fYear :
2002
fDate :
13-17 Oct 2002
Firstpage :
24
Abstract :
Consequences of transition to market for Russian electric power industry are considered in the aspect of power systems development. Motivation and attitude to construction of new power plants, mechanisms of its financing, levels of required electricity prices are analyzed for regulated monopoly and free market. Expected electricity price rise caused by termination of new power plants construction and shortage of electric power at the wholesale market is evaluated.
Keywords :
power markets; power system economics; tariffs; Russia; electric power industry deregulation; electric power shortage; electricity prices; financing; free market; power plants; power systems development; regulated monopoly; wholesale market; Australia; Construction industry; Costs; Electricity supply industry; Energy consumption; Europe; Modems; Monopoly; Power generation; Power system analysis computing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power System Technology, 2002. Proceedings. PowerCon 2002. International Conference on
Print_ISBN :
0-7803-7459-2
Type :
conf
DOI :
10.1109/ICPST.2002.1053497
Filename :
1053497
Link To Document :
بازگشت