Ranking and postponement of investments in planning the Serbian electric power networks
Author :
S. Jovanovic;S. Mrdja;M. Lauby
Author_Institution :
Nikola Tesla Inst., Belgrade, Yugoslavia
Volume :
137
Issue :
5
fYear :
1990
Firstpage :
321
Lastpage :
326
Abstract :
A method for ranking and postponing investments during the planning of electrical power networks is presented. The probabilistic economic criterion which takes into consideration the cost of expected undelivered energy is used to derive a profitability index, a postponement index and combined technical-economical-probabilistic planning criteria. The method allows the ranking and the postponement of technically justified but economically unjustified investments which is especially useful when insufficient investment funds are available for construction.
Keywords :
"Power system planning","Power transmission"
Journal_Title :
IEE Proceedings C - Generation, Transmission and Distribution
Publisher :
iet
ISSN :
0143-7046
Type :
jour
DOI :
10.1049/ip-c.1990.0043
Filename :
58805
Link To Document :
بازگشت