DocumentCode
391066
Title
Optimal control of product completion times in single-stage manufacturing systems with finite output buffers
Author
Moon, J. ; Wardi, Y.
Author_Institution
Sch. of Electr. & Comput. Eng., Georgia Inst. of Technol., Atlanta, GA, USA
Volume
3
fYear
2002
fDate
10-13 Dec. 2002
Firstpage
3555
Abstract
The paper concerns an optimal control problem in single-stage manufacturing systems with finite output buffers. Given a sequence of jobs and their processing order, and given the release time and a due date for each job, the objective is to determine optimal processing times so as to minimize a cost functional consisting of lateness and earliness of the finished products. Jobs completed late are immediately delivered from the system, and jobs completed early are stored at an output buffer while waiting for their due dates. When the buffer gets full the server becomes blocked. Upper-bound and lower-bound constraints on the jobs´ delivery times are imposed. The paper analyzes the problem and proposes an efficient algorithm for its solution.
Keywords
discrete event systems; nonlinear programming; optimal control; production control; queueing theory; stock control; convex programming; delivery times; discrete event dynamic systems; earliness; finite output buffers; hybrid systems; lateness; lower-bound constraints; optimal control; product completion times; single-stage manufacturing systems; upper-bound constraints; Algorithm design and analysis; Buffer storage; Computer aided manufacturing; Cost function; Dynamic programming; Dynamic scheduling; Job shop scheduling; Manufacturing systems; Moon; Optimal control;
fLanguage
English
Publisher
ieee
Conference_Titel
Decision and Control, 2002, Proceedings of the 41st IEEE Conference on
ISSN
0191-2216
Print_ISBN
0-7803-7516-5
Type
conf
DOI
10.1109/CDC.2002.1184428
Filename
1184428
Link To Document