• DocumentCode
    391066
  • Title

    Optimal control of product completion times in single-stage manufacturing systems with finite output buffers

  • Author

    Moon, J. ; Wardi, Y.

  • Author_Institution
    Sch. of Electr. & Comput. Eng., Georgia Inst. of Technol., Atlanta, GA, USA
  • Volume
    3
  • fYear
    2002
  • fDate
    10-13 Dec. 2002
  • Firstpage
    3555
  • Abstract
    The paper concerns an optimal control problem in single-stage manufacturing systems with finite output buffers. Given a sequence of jobs and their processing order, and given the release time and a due date for each job, the objective is to determine optimal processing times so as to minimize a cost functional consisting of lateness and earliness of the finished products. Jobs completed late are immediately delivered from the system, and jobs completed early are stored at an output buffer while waiting for their due dates. When the buffer gets full the server becomes blocked. Upper-bound and lower-bound constraints on the jobs´ delivery times are imposed. The paper analyzes the problem and proposes an efficient algorithm for its solution.
  • Keywords
    discrete event systems; nonlinear programming; optimal control; production control; queueing theory; stock control; convex programming; delivery times; discrete event dynamic systems; earliness; finite output buffers; hybrid systems; lateness; lower-bound constraints; optimal control; product completion times; single-stage manufacturing systems; upper-bound constraints; Algorithm design and analysis; Buffer storage; Computer aided manufacturing; Cost function; Dynamic programming; Dynamic scheduling; Job shop scheduling; Manufacturing systems; Moon; Optimal control;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Decision and Control, 2002, Proceedings of the 41st IEEE Conference on
  • ISSN
    0191-2216
  • Print_ISBN
    0-7803-7516-5
  • Type

    conf

  • DOI
    10.1109/CDC.2002.1184428
  • Filename
    1184428