Abstract :
The grounding system became an important factor in the electrification of the large power systems in the early ´20s, conditioning the choice of the system operation. In recent years, the energy service to the customers and the safety of the persons has become a major concern for the electric utilities. In some contingency cases, a fault can generate a ground potential rise compromising the service quality and the field team security. In this paper, we analyse a case of study, which is the 18 kV-distribution system of the Entreprises Electriques Fribourgeoises (EEF), a private utility in West Switzerland. A methodology is proposed to identify the unacceptable ground potential rise and to limit the customer interruptions. An optimisation, based on technical and legal matters, is then carried out to determine the appropriate improvement of the existing grounding system.
Keywords :
earthing; optimisation; power distribution faults; power distribution reliability; 18 kV; Entreprises Electriques Fribourgeoises; electric utilities; electrification; field team security; large power systems; power distribution system; power system grounding; service quality; Cables; Electrical fault detection; Grounding; Power industry; Power system faults; Power system protection; Power system relaying; Power system stability; Power systems; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrical and Computer Engineering, 2003. IEEE CCECE 2003. Canadian Conference on
ISSN :
0840-7789
Print_ISBN :
0-7803-7781-8
Type :
conf
DOI :
10.1109/CCECE.2003.1226467
Filename :
1226467
Link To Document :
بازگشت