DocumentCode :
405898
Title :
The Z refurbishment project (ZR) at Sandia National Laboratories
Author :
Weinbrecht, E.A. ; McDaniel, D.H. ; Bloomquist, D.D.
Author_Institution :
Sandia Nat. Labs., Albuquerque, NM, USA
Volume :
1
fYear :
2003
fDate :
15-18 June 2003
Firstpage :
157
Abstract :
Sandia´s Z accelerator completed original construction in 1985 as PBFA II. The center portion was modified in 1996, converting from a high voltage to a high current configuration to drive z-pinch loads. The environments created have enabled critical experiments that address many Stockpile Stewardship Program (SSP) and High Energy Density Physics (HEDP) program needs. Z has since grown into a multifaceted workhorse facility. At more than 1000 shots after what was to be a provisional modification to assess scaling of z-pinch current, users are asking that Z be a stable, precision platform for a large number and variety of reliable, reproducible experiments. Much of Z was not optimized for z-pinch applications nor designed for the rigors of daily use at today´s 18+ MA output level. This paper provides an overview of the Z Refurbishment (ZR) project, including performance criteria, timeline, test and integration strategies, and current status of the project.
Keywords :
Z pinch; optimisation; project engineering; Sandia National Laboratories; Z accelerator; Z refurbishment project; current status; high energy density physics; integration strategies; multifaceted workhorse facility; performance criteria; stockpile stewardship program; z-pinch loads; Design optimization; Hardware; Ion accelerators; Laboratories; Particle accelerators; Physics; US Department of Energy; Voltage; Weapons; Zirconium;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Pulsed Power Conference, 2003. Digest of Technical Papers. PPC-2003. 14th IEEE International
Conference_Location :
Dallas, TX, USA
Print_ISBN :
0-7803-7915-2
Type :
conf
DOI :
10.1109/PPC.2003.1277682
Filename :
1277682
Link To Document :
بازگشت