DocumentCode
408544
Title
Fermilab Booster beam collimation and shielding
Author
Mokhov, N.V. ; Drozhdin, A.I. ; Kasper, P.H. ; Lackey, J.R. ; Prebys, E.J. ; Webber, R.C.
Author_Institution
Fermi Nat. Accel. Lab., USA
Volume
3
fYear
2003
fDate
12-16 May 2003
Firstpage
1503
Abstract
The beam power in the upgraded Booster at 8 GeV and 10 Hz will be 64 kW. Beam loss can result in high radiation loads in the ring. The purpose of a new beam halo cleaning system is to localize proton losses in specially shielded regions. Calculations show that this 2-stage collimation system will localize about 99% of beam loss in straight sections 6 and 7 and immediately downstream. Beam loss in the rest of the machine will be on average 0.1 W/m. Local shielding will provide tolerable prompt and residual radiation levels in the tunnel, above the tunnel at the surface and in the sump water. Results of thorough MARS calculations are presented for a new design which includes shielding integrated with the collimators, motors and controls ensuring a high performance and facilitating maintenance.
Keywords
beam handling techniques; collimators; proton accelerators; synchrotrons; 10 Hz; 64 kW; 8 GeV; Fermilab Booster beam collimation; Fermilab Booster beam shielding; beam halo cleaning system; collimators; high radiation loads; proton losses; Cleaning; Collimators; Loss measurement; Mars; Particle beam injection; Particle beams; Particle scattering; Protons; Radio frequency; Tungsten;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
ISSN
1063-3928
Print_ISBN
0-7803-7738-9
Type
conf
DOI
10.1109/PAC.2003.1288575
Filename
1288575
Link To Document