Title :
Final results on the CERN PS electrostatic septa consolidation program
Author :
Borburgh, J. ; Hourican, M. ; Prost, A.
Author_Institution :
CERN, Geneva, Switzerland
Abstract :
The CERN PS electrostatic septum consolidation program is coming to completion after almost 4 years of development. The program was started to fulfil the increased requirements on vacuum performance and the need to reduce the time necessary for maintenance interventions. The new design of septum 31, used for the so-called ´continuous transfer´ 5-turn extraction, and the related construction issues will be presented together with the operational experience gained during the PS 2002 run. In addition, the experience of two years of operation with the new generation septum 23, used for a resonant slow extraction, will be briefly discussed. The continued development undertaken since its installation in the PS ring in 2001 will also be described.
Keywords :
electrostatic accelerators; particle beam extraction; 5-turn extraction; CERN PS electrostatic septum consolidation program; PS ring; resonant slow extraction; septum 23; septum 31; vacuum performance; Anodes; Electrostatics; Ion accelerators; Particle accelerators; Personnel; Petroleum; Resonance; Vacuum systems; Vacuum technology; Voltage;
Conference_Titel :
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
Print_ISBN :
0-7803-7738-9
DOI :
10.1109/PAC.2003.1288622